Tarikh
|
Keterangan Urusniaga
|
Jumlah Belian
|
Jumlah Besar
|
25/7/2013
|
Beli Bahan Binaan(20 besi,3000 bata, 20 simen, 8 plywood, 30 btg kayu1x2.
|
RM2214.00
|
RM 2214.00
|
28/7/2013
|
Beli pasir 1 lori (Pasir belimbing)
|
RM 90.00
|
RM 2304.00
|
28/7/2013
|
Beli 5 tan batu kelikir 3/4
|
RM 180.00
|
RM 2484.00
|
28/7/2013
|
Beli 1 lori kecil pasir (KOMAJU)
|
RM 80.00
|
RM 2564.00
|
29/7/2013
|
Simen 15, kayu 1x2x30,paku 1.5 kg
|
RM417.00
|
RM 2981.00
|
30/7/2013
|
Frame besi, frame plastik, paku simen,plastik teduh,tali.
|
RM 172.00
|
RM 3153.00
|
01/08/2013
|
Bayar upah tukang kali pertama termasuk pendahuluan utk hari raya puasa
|
RM2000.00
|
RM 5153.00
|
14/08/2013
|
20 batang kayu 2X4X14XRM1.80
|
RM500.00
|
RM 5653.00
|
15/08/2013
|
Upah tukang kali ke 2(3 hari bekerja)
|
RM500.00
|
RM 6153.00
|
20/08/2013
|
20 simen,15 besi Y12,Paku,Dawai,paip 2", kayu 2x2
|
RM1102.00
|
RM 7255.00
|
21/08/2013
|
Beli 3 pcs penyambung paip 3 "
|
RM13.50
|
RM 7268.50
|
22/08/2013
|
Upah tukang kali ke 3
|
RM900.00
|
RM 8168.50
|
29/08/2013
|
Belian kayu 1x2, 2x4
|
RM1040.00
|
RM 9208.50
|
29/08/2013
|
Belian atap, paku, perabung, pintu plastik
|
RM1440.00
|
RM 10648.50
|
29/08/2013
|
Upah tukang
|
RM 600.00
|
RM 11248.50
|
02/09/2013
|
Beli pasir (lori 5 tan)
|
RM70.00
|
RM 11318.50
|
03/09/2013
|
Beli 2 unit staging
|
RM240.00
|
RM 11558.50
|
05/09/2013
|
Bayar upah tukang
|
RM1000.00
|
RM 12558.50
|
05/09/2013
|
Belian barang utk siling
|
RM518.00
|
RM 13076.50
|
07/09/2013
|
Bayar harga tingkap sliding (Bahrin)
|
RM 800.00
|
RM 13876.50
|
09/09/2013
|
Simen (15 beg)
|
RM277.50
|
RM 14154.00
|
09/09/2013
|
Set tandas duduk,sink,paip,cermin.
|
RM623.00
|
RM 14777.00
|
11/09/2013
|
Bayar upah tukang
|
RM1000.00
|
RM 15777.00
|
11.9.2013
|
Pasir
plas komaju
|
RM130.00
|
RM15907.00
|
11.9.2013
|
Alat
paip
|
RM 15.00
|
RM15922.00
|
16.9.2013
|
ALAT
PAIP
|
RM126.00
|
RM16048.00
|
16.9.2013
|
ALAT
BINAAN
|
RM218.00
|
RM16266.00
|
18.9.2013
|
ALAT
PAIP TAMBAHAN
|
RM 33.00
|
RM16299.00
|
19.9.2013
|
UPAH
TUKANG
|
RM1000.00
|
RM17299.00
|
21.9.2013
|
25
SIMEN
|
RM
462.00
|
RM17761.00
|
21.9.2013
|
KEPALA
PAIP STELL
|
RM32.00
|
RM17793.00
|
26.9.2013
|
UPAH
TUKANG
|
RM2000.00
|
RM19793.00
|
26.9.2013
|
UPAH
KAKI LIMA MAINHOLE
|
RM500.00
|
RM20293.00
|
26.9.2013
|
UPAH
PASANG PAIL
|
RM350.00
|
RM20643.00
|
26.9.2013
|
BELI
CAT SILING 20L
|
RM68.00
|
RM20711.00
|
28.9.2013
|
PERALATAN
MENGECAT
|
RM26.00
|
RM20737.00
|
3.10.2013
|
CAT
KCC
|
RM176.00
|
RM20913.00
|
3.10.2013
|
MEZEK
PAGAR
|
RM114.00
|
RM21027.00
|
09.10.13
|
I
TIN CAT KCC
|
RM88.00
|
RM21115.00
|
10.10.13
|
BAYAR
GRIL BESI
|
RM350.00
|
RM21465.00
|
13.10.13
|
CAT
ALAS JOTUN
|
RM175.00
|
RM21640.00
|
20.10.2013
|
MOZEK
|
RM1202.00
|
RM22842.00
|
20.10.2013
|
BAIKI
GRINDER DAN MATA
|
RM50.00
|
RM22892.00
|
28.10.2013
|
KIPAS
ANGIN, EXHAUS FAN DLL
|
RM680.00
|
RM23572.00
|
31.10.2013
|
DEPOSIT
WIRING EWAN
|
RM1500.00
|
RM25072.00
|
31.10.2013
|
Beli 3 pintu kayu meranti
|
RM870.00
|
RM25942.00
|
7/11/2013
|
Bayar upah plaster tingkap
|
RM 50.00
|
RM25992.00
|
7/11/2013
|
Bayar harga frame tingkap sliding
|
RM 120.00
|
RM26112.00
|
9/11/2013
|
Upah Man ketuk tingkap dan plas
|
RM 300.00
|
RM26412.00
|
02/01/2014
|
UPAH PASANG MOZEK
|
RM800.00
|
RM27212.00
|
09/01/2014
|
UPAH MOZEK BILIK AIR
|
RM700.00
|
RM29212.00
|
09/01/2014
|
UPAH PSG SINK DAN MANGKUK TANDAS
|
RM 80.00
|
RM27992.00
|
05/01/2014
03/01/2014 12/01/14 |
BELI MOZEK GANTI KETUK
BELIAN BARANG UTK PAIP SILING DAN ZINK ALUMINIUM |
RM100.00
RM54.00 RM18.40 |
RM28892.00
RM28946.00 RM28964.40 |
UPAH TUKANG BUAT BINAAN RM 9000.00 (HABIS DIBAYAR)
UPAH KAKI LIMA RM 500.00 (HABIS DIBAYAR)
UPAH PEMASANGAN PAIP RM 350.00 (HABIS DIBAYAR)
UPAH KAKI LIMA RM 500.00 (HABIS DIBAYAR)
UPAH PEMASANGAN PAIP RM 350.00 (HABIS DIBAYAR)
TARIKH MULA BINA : 24/07/2013
TARIKH SIAP BINA : 13/01/2014
TARIKH SIAP BINA : 13/01/2014
TEMPOH BINAAN : FLEXIBLE
KOS UPAH TUKANG SEHINGGA SIAP BINAAN :
RM7560.00 + RM1440.00 = RM9000.00
Nota: Berlaku tambahan RM1440 kerana telah dibuat perubahan ke atas binaan gutter untuk mengelakkan bumbung asal dirombak (elak kebocoran atap)
RM7560.00 + RM1440.00 = RM9000.00
Nota: Berlaku tambahan RM1440 kerana telah dibuat perubahan ke atas binaan gutter untuk mengelakkan bumbung asal dirombak (elak kebocoran atap)
REKOD UPAH TUKANG
UPAH DIBAYAR BERDASARKAN BILANGAN HARI KERJA DISIAPKAN.
UPAH TUKANG DIJELASKAN BERDASARKAN BILANGAN HARI BEKERJA DAN DIJELAS SEPENUHNYA SETELAH SEMUA KERJA DISIAPKAN DENGAN SEMPURNA.
UPAH TUKANG DIBAYAR SETIAP MINGGU MENGIKUT BILANGAN TUKANG BEKERJA.
TARIKH
|
JUMLAH
DIBAYAR
|
BAKI
UPAH
|
10/08/2013
|
RM2000.00(7 HARI)
|
RM5560.00
|
15/08/2013
|
RM500.00(3 HARI)
|
RM5060.00
|
22/08/2013
|
RM900.00(5 HARI)
|
RM4160.00
|
29/08/2013
|
RM600.00(5 HARI)
|
RM3560.00
|
01/09/2013
|
Tambah upah RM1440
|
RM5000.00
|
05/09/2013
|
RM1000.00(5 HARI)
|
RM4000.00
|
11/09/2013
|
RM 1000.00 (5 hari)
|
RM3000.00
|
19/09/2013
|
RM 1000.00 (5 hari)
|
RM2000.00
|
26/09/2013
|
RM 2000.00 (5HARI)
|
HABIS
|
16 OKTOBER 2013