PERBELANJAAN MEMBINA ASFANISYA HOMESTAY (RM22,680.000

Tarikh
Keterangan Urusniaga
Jumlah Belian
Jumlah Besar
25/7/2013
Beli Bahan Binaan(20 besi,3000 bata, 20 simen, 8 plywood, 30 btg kayu1x2. 
RM2214.00
RM   2214.00
28/7/2013
Beli pasir 1 lori (Pasir belimbing)
RM    90.00
RM   2304.00
28/7/2013
Beli 5 tan batu kelikir 3/4
RM  180.00
RM   2484.00
28/7/2013
Beli 1 lori kecil pasir (KOMAJU)
RM     80.00
RM   2564.00
29/7/2013
Simen 15, kayu 1x2x30,paku 1.5 kg
RM417.00
RM   2981.00
30/7/2013
Frame besi, frame plastik, paku simen,plastik teduh,tali.
RM 172.00
RM   3153.00
01/08/2013
Bayar upah tukang kali pertama termasuk pendahuluan utk hari raya puasa
RM2000.00
RM   5153.00
14/08/2013
20 batang kayu 2X4X14XRM1.80
RM500.00
RM   5653.00
15/08/2013
Upah tukang  kali ke 2(3 hari bekerja)
RM500.00
RM   6153.00
20/08/2013
20 simen,15 besi Y12,Paku,Dawai,paip 2", kayu 2x2
RM1102.00
RM   7255.00
21/08/2013
Beli 3 pcs penyambung paip 3 "
RM13.50
RM   7268.50
22/08/2013
Upah tukang kali ke 3
RM900.00
RM   8168.50
29/08/2013
Belian kayu 1x2, 2x4
RM1040.00
RM   9208.50
29/08/2013
Belian atap, paku, perabung, pintu plastik
RM1440.00
RM  10648.50
29/08/2013
Upah tukang
RM 600.00
RM  11248.50
02/09/2013
Beli pasir (lori 5 tan)
RM70.00
RM  11318.50
03/09/2013
Beli 2 unit staging
RM240.00
RM  11558.50
05/09/2013
Bayar upah tukang
RM1000.00
RM   12558.50
05/09/2013
Belian barang utk siling
RM518.00
RM   13076.50
07/09/2013
Bayar harga tingkap sliding (Bahrin)
RM 800.00
RM   13876.50
09/09/2013
Simen (15 beg)
RM277.50
RM   14154.00
09/09/2013
Set tandas duduk,sink,paip,cermin.
RM623.00
RM   14777.00
11/09/2013
Bayar upah tukang
RM1000.00

RM   15777.00

11.9.2013
Pasir plas komaju
RM130.00
RM15907.00
11.9.2013
Alat paip
RM   15.00
RM15922.00
16.9.2013
ALAT PAIP
RM126.00
RM16048.00
16.9.2013
ALAT BINAAN
RM218.00
RM16266.00
18.9.2013
ALAT PAIP TAMBAHAN
RM   33.00
RM16299.00
19.9.2013
UPAH TUKANG
RM1000.00
RM17299.00
21.9.2013
25 SIMEN
RM 462.00
RM17761.00
21.9.2013
KEPALA PAIP STELL
RM32.00
RM17793.00
26.9.2013
UPAH TUKANG
RM2000.00
RM19793.00
26.9.2013
UPAH KAKI LIMA MAINHOLE
RM500.00
RM20293.00
26.9.2013
UPAH PASANG PAIL
RM350.00
RM20643.00
26.9.2013
BELI CAT SILING 20L
RM68.00
RM20711.00
28.9.2013
PERALATAN MENGECAT
RM26.00
RM20737.00
3.10.2013
CAT KCC
RM176.00
RM20913.00
3.10.2013
MEZEK PAGAR
RM114.00
RM21027.00
09.10.13
I TIN CAT KCC
RM88.00
RM21115.00
10.10.13
BAYAR GRIL BESI
RM350.00
RM21465.00
13.10.13
CAT ALAS JOTUN
RM175.00
RM21640.00
20.10.2013
MOZEK
RM1202.00
RM22842.00
20.10.2013
BAIKI GRINDER DAN MATA
RM50.00
RM22892.00
28.10.2013
KIPAS ANGIN, EXHAUS FAN DLL
RM680.00
RM23572.00
31.10.2013
DEPOSIT WIRING EWAN
RM1500.00
RM25072.00
31.10.2013
Beli 3 pintu kayu meranti
RM870.00
RM25942.00
7/11/2013
Bayar upah plaster tingkap
RM   50.00
RM25992.00
7/11/2013
Bayar harga frame tingkap sliding
RM 120.00
RM26112.00
9/11/2013
Upah Man ketuk tingkap dan plas 
RM 300.00
RM26412.00
02/01/2014
UPAH PASANG MOZEK
RM800.00
RM27212.00
09/01/2014
UPAH MOZEK BILIK AIR
RM700.00
RM29212.00
09/01/2014
UPAH PSG SINK DAN MANGKUK TANDAS
RM  80.00
RM27992.00
05/01/2014
03/01/2014
12/01/14
BELI MOZEK GANTI KETUK
BELIAN BARANG UTK PAIP
SILING DAN ZINK ALUMINIUM
RM100.00
RM54.00
RM18.40
RM28892.00
RM28946.00
RM28964.40

UPAH TUKANG BUAT BINAAN       RM   9000.00 (HABIS DIBAYAR)
UPAH KAKI LIMA                              RM     500.00 (HABIS DIBAYAR)
UPAH PEMASANGAN PAIP              RM     350.00 (HABIS DIBAYAR)
                                           

TARIKH MULA BINA : 24/07/2013

TARIKH SIAP BINA   :  13/01/2014

TEMPOH BINAAN : FLEXIBLE



KOS UPAH TUKANG SEHINGGA SIAP BINAAN :
RM7560.00 + RM1440.00 = RM9000.00

Nota: Berlaku tambahan RM1440 kerana telah dibuat perubahan ke atas binaan gutter untuk mengelakkan bumbung asal dirombak (elak kebocoran atap)



                                        REKOD UPAH TUKANG

UPAH DIBAYAR BERDASARKAN BILANGAN HARI KERJA DISIAPKAN.

UPAH TUKANG DIJELASKAN BERDASARKAN BILANGAN HARI BEKERJA DAN DIJELAS SEPENUHNYA SETELAH SEMUA KERJA DISIAPKAN DENGAN SEMPURNA.
UPAH TUKANG DIBAYAR SETIAP MINGGU MENGIKUT BILANGAN TUKANG BEKERJA.


TARIKH
JUMLAH DIBAYAR
BAKI UPAH
10/08/2013
RM2000.00(7 HARI)
RM5560.00
15/08/2013
RM500.00(3 HARI)
 RM5060.00
22/08/2013
RM900.00(5 HARI)
RM4160.00
29/08/2013
RM600.00(5 HARI)
RM3560.00
01/09/2013
Tambah upah RM1440
RM5000.00
       05/09/2013
RM1000.00(5 HARI)
RM4000.00
       11/09/2013
   RM 1000.00 (5 hari)    
           RM3000.00
       19/09/2013
   RM 1000.00 (5 hari)
           RM2000.00
        26/09/2013      
   RM  2000.00 (5HARI) 
                HABIS


















GAMBAR-GAMBAR HOMESTAY DALAM PEMBINAAN







16 OKTOBER 2013